Yonion2801
Newbie
- Joined
- Feb 7, 2023
- Messages
- 4
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1
- Activity points
- 45
I am using ADS the design guide-amplifier-DC and bias point simulation-BJT_ft_fmax_vs Bias cell to simulate the Fmax variance with the sweep of IC. when I use the original schmatic with original ideal BJT, this cell works and I can get the results like below:
but when I change the BJT from the ideal one to the PDK, I can't get the full result(only get two) like below:
I check the error from the plot:Maximum frequency of oscillation (fmax) and other plot.
While evaluating "LcsGetNewExpName1":
Operation "[ ] sweep access", index out of range in dimension 1, independent "freq" must use an index in the range 0 <= index < 0
Can anyone knows what is going on and how to solve this?
thanks in advance!
but when I change the BJT from the ideal one to the PDK, I can't get the full result(only get two) like below:
I check the error from the plot:Maximum frequency of oscillation (fmax) and other plot.
While evaluating "LcsGetNewExpName1":
Operation "[ ] sweep access", index out of range in dimension 1, independent "freq" must use an index in the range 0 <= index < 0
Can anyone knows what is going on and how to solve this?
thanks in advance!