Why is the clock phase introduced in the calculation of required arrival time?

Status
Not open for further replies.

pratap_v

Member level 4
Joined
Jan 6, 2007
Messages
71
Helped
10
Reputation
20
Reaction score
7
Trophy points
1,288
Activity points
1,688
why is the clock phase introduced in the calculation of required arrival time? How is it determined.
 

about clock phase

Hi,
To ensure Hold and setup times in latches.
 