coshy
Member level 4
After Gate Level Simulation of Dhrystone, 3rd party Company successfully done for average power report to me.
After job, then they asked the power peak dump duration from the Gate Level Simulation on FSDB file for checking IR-DROP.
when I said a start and end point "2.5us~30us", they want to narrow it more in "50ns". probably 2.5us~30us is very long for them.
Here I'm confused where duration is most peak power in the Dhrystone Gate Level Simulation.
After job, then they asked the power peak dump duration from the Gate Level Simulation on FSDB file for checking IR-DROP.
when I said a start and end point "2.5us~30us", they want to narrow it more in "50ns". probably 2.5us~30us is very long for them.
Here I'm confused where duration is most peak power in the Dhrystone Gate Level Simulation.
Last edited: