jszair
Junior Member level 3
Hi all,
I need to do a verification related class project. I'm thinking of using ovm to verify a project from opencores.
I'm new to verification and ovm so I don't know how big of a verification target is suitable for a term project...which needs to be done in 1.5 month. One choice in my mind is a spi interface controller.
Any suggestions?
Thanks!
I need to do a verification related class project. I'm thinking of using ovm to verify a project from opencores.
I'm new to verification and ovm so I don't know how big of a verification target is suitable for a term project...which needs to be done in 1.5 month. One choice in my mind is a spi interface controller.
Any suggestions?
Thanks!