Hi,
A company is getting a custom offline SMPS designed, of spec...
Vout = 40V
Pout = 400W peak, 200W average.
100-265VAC
Fully Isolated
They are thinking of going with a company who will do it with their own PWM controllers, which contain their own software...as such, the company is then "tied" to this power supply design consultancy, and must purchase the PWM control chips from them for every production run.
Is this a good idea?