Hi,
First group the signal address and data signal Address (Addr0-12) data BUS 1(Data0-7 and DM0,DQS0) Data Bus2 (8-15 with DM1 and DQS1)and control signal (CAS,CS0,CS1,RAS,WE,BA0,BA1) set in constraint Manager
- - - Updated - - -
after that route the signal for data signal reference length is strobe signal you have match the length matching according to the data strobe.
- - - Updated - - -
for your reference follow this https://www.edaboard.com/threads/283545/#post1307462
it may be helpful for you