aditya1579
Member level 2
Hi,
In my timing runs, I see that the phase shift appears as 0.5ns in the timing reports. But since the rest of the reports is in ps, I see a huge slack (WNS). How do I resolve this to make the tool take 500ps as the phase shift, thus correcting the slack no to where it should be ?
The clock period is indeed 0.5ns as in the sdc file.
Thanks,
Aditya
In my timing runs, I see that the phase shift appears as 0.5ns in the timing reports. But since the rest of the reports is in ps, I see a huge slack (WNS). How do I resolve this to make the tool take 500ps as the phase shift, thus correcting the slack no to where it should be ?
The clock period is indeed 0.5ns as in the sdc file.
Thanks,
Aditya