chipmonk1027
Newbie level 6
Hi Guys,
I am designing my first multi layer board with eagle, and I noticed something really really strange. Well you declare the types of vias (blind and buried), then when routing I would have expected eagle to show an error when I move between two layers that have no via declared in the layers setting.. Ok am sure that's quite difficult to understand so I have attached my Layer settings and... what I mean is if I move from layer 2 to layer 16 eagle will just place a via... but look at the layer settings there is no buried via that connects those two layers. Whats the issue there?
I am designing my first multi layer board with eagle, and I noticed something really really strange. Well you declare the types of vias (blind and buried), then when routing I would have expected eagle to show an error when I move between two layers that have no via declared in the layers setting.. Ok am sure that's quite difficult to understand so I have attached my Layer settings and... what I mean is if I move from layer 2 to layer 16 eagle will just place a via... but look at the layer settings there is no buried via that connects those two layers. Whats the issue there?