There could be ways to reduce the effect of these transients on the local electrical network, for example by ensuring that these AirCon were not switched simultaneously (eg with a kind of relay delay timer), or even by installing a power line filter in the socket of each of these equipments; However, there is a possibility of an overload or even some other problem in the local electrical installation that may be undersized. By the way, if the quality of the electricity grid is a critical item, I would consider researching refrigeration appliances based on Peltier technology.