cschen
Newbie level 4
need lvs verification
Hello, I have some questions of LVS for cell-based design.
1. Since both the layout and netlist are generated by P&R tools,
is it necessary to do LVS?
2. We add the bond cells of the staggered IOs in layout editor
and add texts on those cells for runnung LVS. Also, we have to
modify the netlist from P&R stage because of the newly added
bond cells. Is there any automatic approach to do these jobs?
3. If possible, could anyone tell me the procedures of LVS in your
company?
Thanks for your answers!
Hello, I have some questions of LVS for cell-based design.
1. Since both the layout and netlist are generated by P&R tools,
is it necessary to do LVS?
2. We add the bond cells of the staggered IOs in layout editor
and add texts on those cells for runnung LVS. Also, we have to
modify the netlist from P&R stage because of the newly added
bond cells. Is there any automatic approach to do these jobs?
3. If possible, could anyone tell me the procedures of LVS in your
company?
Thanks for your answers!