vivek_p
Advanced Member level 4
I want to know whether clock gating will affect the critical path of the design? Will Clock Gating change the critical path of the design
Before clock gating , critical path delay was 10 ns
After clock gating, critical path delay is 6 ns (And that too in another path !!!)
How can this happen. Can anyone explain.
Before clock gating , critical path delay was 10 ns
After clock gating, critical path delay is 6 ns (And that too in another path !!!)
How can this happen. Can anyone explain.