eem2am
Banned
Imagine you have designed a 50W offline flyback SMPS.
The switching transistor is a TO220 package , which must be screwed to a heatsink, and heatsink paste *must* be applied between heatsink and FET.
How can you know, that the assembly staff are properly applying the heatsink paste or not?
The switching transistor is a TO220 package , which must be screwed to a heatsink, and heatsink paste *must* be applied between heatsink and FET.
How can you know, that the assembly staff are properly applying the heatsink paste or not?