Components:
  • reducer BRC Tecno 100KW (as small as possible) 70KW would be also a good one
  • solenoid of the liquid phase of gas with the filter
  • burner mixer 36mm with reduction on 20mm
  • tourist gas cylinder 3kg, 11kg or car gas cylinder with added refuelling connector
  • pump able to emboss a hot liquid
  • balance tank
  • register for gas line
  • steel tube
Firstly, find a place of mounting the reducer.



Weld a steel tube on the exhaust, it will receive warm, which is necessary to heat the reducer.



Then mount the pump and the balance tank.



Connect the whole with hoses dedicated to the cooling systems.



Mount the mixer.



Mount the gas valve.



At the end you need to check the sealing of the installation, for example with the water with dishwashing liquid.


Link to original thread – Instalacja gazowa w silniku chłodzonym powietrzem
 

Status
Not open for further replies.

Similar threads

Cookies are required to use this site. You must accept them to continue using the site. Learn more…