rohanjuneja
Newbie
Hi all,
I am looking to get the critical time of a circuit when specific set of inputs is given. Example, for a 4-bit multiplier, I want to check the critical time when multiplying 8'd4 and 8'd3, and when multiplying 8'd1 and 8'd2.
Is this possible with Primetime? Could someone guide me how to do this?
Thanks!
I am looking to get the critical time of a circuit when specific set of inputs is given. Example, for a 4-bit multiplier, I want to check the critical time when multiplying 8'd4 and 8'd3, and when multiplying 8'd1 and 8'd2.
Is this possible with Primetime? Could someone guide me how to do this?
Thanks!