Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Hello friends
if i Connect line 90 degrees to the VIA Is this standard work?
Thank
The drill-to-drill clearance design rule might be violated.
if i Connect line 90 degrees to the VIA Is this standard work?
Why do you want to add two neighbor vias at the same track ? The purpose of the via is to change the layer on routing, and it was already made with the first one.
It could be for increased current capabilities. From his image, it looks like the two traces are going to ground. I often did this with high power traces.