Magnethicc
Member level 3
Hello everyone,
I was wondering how would you go about interleaving 4 boost converters with 90 degrees shift between each one?
I was thinking of using the LT6906 to generate clock signal (at 4 times the desired boost frequency) and then connect it to CD4017 counter to produce 4 sync signals which will be sent to UCC28C42 Current Mode controllers.
Does anyone have a better idea on how to achieve this feat, or any recommendations?
I was wondering how would you go about interleaving 4 boost converters with 90 degrees shift between each one?
I was thinking of using the LT6906 to generate clock signal (at 4 times the desired boost frequency) and then connect it to CD4017 counter to produce 4 sync signals which will be sent to UCC28C42 Current Mode controllers.
Does anyone have a better idea on how to achieve this feat, or any recommendations?