cupoftea
Advanced Member level 6
Hi,
Do you think itll be ok to pllel two of these, (12A relays) for a 4kW SMPS off 240VAC?.....
(will ry and make the tracking to each relay of similar resistance)
How will these relays fayre when we reduce VAC to 100VAC and each relay has to carry 23Arms? (they are only 12A rated). How long till they fail?
Do you think itll be ok to pllel two of these, (12A relays) for a 4kW SMPS off 240VAC?.....
(will ry and make the tracking to each relay of similar resistance)
How will these relays fayre when we reduce VAC to 100VAC and each relay has to carry 23Arms? (they are only 12A rated). How long till they fail?