raed_microwave
Advanced Member level 4
- Joined
- Jul 26, 2008
- Messages
- 107
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1,296
- Location
- Kassel, Germany, Germany
- Activity points
- 2,066
Hi
Recently I have bought Hittite switch (HMC547LP3) and it is in QFN package and I know from data sheet that there some pins for ground connection and there is exposed ground paddle in the center of package. I'd like to know , is it possible to connect the pins for grounding to the exposed ground paddle in the layout or I have to put a ground for each pin ?, Actually this is first time for me to draw like this layout, therefore I need your help to draw the grounds in the layout of this package.
I have attached the outline drawing of switch.
Thanks in advance
Recently I have bought Hittite switch (HMC547LP3) and it is in QFN package and I know from data sheet that there some pins for ground connection and there is exposed ground paddle in the center of package. I'd like to know , is it possible to connect the pins for grounding to the exposed ground paddle in the layout or I have to put a ground for each pin ?, Actually this is first time for me to draw like this layout, therefore I need your help to draw the grounds in the layout of this package.
I have attached the outline drawing of switch.
Thanks in advance