difflvl
Advanced Member level 4
I have two stackups in mind.
L1 - Signal / Power
L2 - GND Plane
L3 - Signal
L4 - GND Pour only no signals
L1 - Signal
L2 - GND Plane
L3 - Power Plane
L4 - Signal
Which is better?
Also is it bad to add GND pours on all the layers besides planes even though I already have a GND plane? Is there such thing as over doing the ground pours?
Thanks
L1 - Signal / Power
L2 - GND Plane
L3 - Signal
L4 - GND Pour only no signals
L1 - Signal
L2 - GND Plane
L3 - Power Plane
L4 - Signal
Which is better?
Also is it bad to add GND pours on all the layers besides planes even though I already have a GND plane? Is there such thing as over doing the ground pours?
Thanks