cmos babe
Full Member level 4
xilinx multicycle multiplier
Can someone show me an example of how this constraint is used?
According to the constraints guide :
When should this constraint be used? For example in my design the ALU is by far the worst-case path , how can multicycle path constraint be used in this situation ? and how will it affect the overall behavior of the design? THANKS
Can someone show me an example of how this constraint is used?
According to the constraints guide :
Multicycle Paths (FROM/THRU/TO)
Definition
Establishes a maximum acceptable time delay between groups of elements relative to
another timing specification.
When should this constraint be used? For example in my design the ALU is by far the worst-case path , how can multicycle path constraint be used in this situation ? and how will it affect the overall behavior of the design? THANKS