Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

SE power connection wroute problem...

Status
Not open for further replies.

jelydonut

Full Member level 4
Full Member level 4
Joined
Dec 27, 2002
Messages
239
Helped
3
Reputation
6
Reaction score
0
Trophy points
1,296
Activity points
1,730
Im going nuts.. for some reason i cannot seem to get the IO power pads to connect to the power ring when routing.. however, when i perform a verify connection it tells me that VDD and VSS are not connected and selecting the IO pin shows the fly lines to the cells VDD and VSS pins..
If the tool knows they should be connected and arn't, then why isn't wroute connecting them?

any ideas would be appriciated

jelydonut
 

I too faced similar problems in Magma.Best way to solve is manually do the connections for the ones the tool is unable to do
 

    jelydonut

    Points: 2
    Helpful Answer Positive Rating
might be hockup pins are not connected between power pads & power rings.
 

Although the IO pads and power ring both might be defined to connect to power and ground, sometimes they are defined diffrently. e.g. check if pads have "VDD" and power ring has "VDD" on them (should not be "vdd" - lower case in either). If so, then change it to be consistent.

Here is how we handle it in Magma:

force plan net VDD $m -usage power -port VDD
force plan net VSS $m -usage ground -port VSS
force plan net VDD $m -usage power -port vdd
force plan net VSS $m -usage ground -port vss
force plan net VSS $m -usage ground -port GND


-Anupam
 

Status
Not open for further replies.

Part and Inventory Search

Welcome to EDABoard.com

Sponsor

Back
Top